Systems / On Shore / Low Cement Top System

The Lee Energy Systems’ PPT Gator Perforator allows operators to perforate multiple zones and see individual zonal injection rates on one trip. The system can be run on jointed pipe or coiled tubing.

Bottom hole assembly

Low Cement Top System bottom hole assembly, top to bottom
  1. Unloader Sub (ULS)

    to unload internal pressure and allow the annulus and tubing to equalize for retraction of the Gator.

  2. GATOR PERFORATOR

    Hydro-Mechanical Perforator

    More about the Gator Perforator →
  3. Mechanical Set Packer

    Tension or Rotaionally set

TALK TO AN EXPERT