The C4 annular barrier system was deployed on two wells on jointed pipe. The use of Gator Mechanical perforator allowed to gain access to the back side of the 7 in casing. The washout of the barite and cement behind the casing was completed with the Jack Hammer to place a new cement column behind the casing.

Bottom hole assembly

PWC/C4 System bottom hole assembly, top to bottom
  1. SPEED SQUEEZE

    Used to create a choke point in the A-annulus to force the fluid flow path into the B-annulus for a more effective clean out

    More about the Speed Squeeze →
  2. JACK HAMMER

    Impact vibration and jetting used to break up and dislodge stubborn cement or barite during washing

    More about the Jack Hammer →
  3. GATOR PERFORATOR

    Hydro-Mechanical Perforator

    More about the Gator Perforator →
  4. MEGA PACKER

    expands to create the A B annulus cement supoprt barrier

    More about the Mega Packer →