Systems / Completion / Pre-Perforating

Operation

  • Run in hole to desired depth straddling the packers over the intended stim zone.
  • Circulate through the VCV at specified rate.
  • Activate Packers by flowing at specified rate to close VCV & within the rate window for zonal stimulation.
  • To deactivate packers, simply kick out the pumps. The packers will retract to their original position.
  • Allow time for annular equalization and pull to the next stage.
  • Repeat Activation, Stimulation, and Deactivation sequence for all intended zones.
  • When stages are complete, pull out of hole.

Bottom hole assembly

Pre-Perforating bottom hole assembly, top to bottom
  1. Unloader Sub (ULS)

    to unload internal pressure and allow the annulus and tubing to equalize for retraction of the Gator.

  2. GATOR PERFORATOR

    Hydro-Mechanical Perforator

    More about the Gator Perforator →
  3. Velocity Control Valve

    Pump above 200 L/min closes valve